Experts’ Engagement in Risk Analysis: A Model Merging Analytic Hierarchy Process and Monte Carlo Simulation

Cintia Bardauil Baptistucci, Gerson Pech, Marly Monteiro Carvalho

Abstract


This paper presents a risk analysis model merging Analytic Hierarchy Process (AHP) and Monte Carlo simulation (MCS) that enables risk prioritization, providing a contingent cost analysis. The model has six steps: risk factors definition; risk frequency prioritization using the AHP; probability estimation for risk effects; probability distribution for other variabilities; correlation analysis between cost and time; and MCS for cost estimation. The proposed model was applied to 12 industrial wastewater projects. Data were gathered from interviews and documents. The results show three major contributions: a decision tool to identify, analyze and assess the risks, experts’ engagement (knowledge and perception), and visual output for risk analysis.


Keywords


Risk Management; Risk Factors; Analytic Hierarchy Process; Monte Carlo Simulation; Construction Projects

References


Acebes, F., Pajares, J., Galán, J.M., & López-Paredes, A. (2014). A new approach for project control under uncertainty: Going back to the basics. International Journal of Project Management, 32(3), 423–434.

Acebes, F., Pereda, M., Poza, D., Pajares, J., & Galán, J.M. (2015). Stochastic earned value analysis using Monte Carlo simulation and statistical learning techniques. International Journal of Project Management, 33(7), 1597–1609.

Albogamy, A., & Dawood, N. (2015). Development of a client-based risk management methodology for the early design stage of construction processes. Engineering, Construction and Architectural Management, 22(5), 493–515.

Associação Brasileira De Normas Técnicas – ABNT (2011). NBR 12209:2011 - Elaboração de projetos hidráulicos-sanitários de estações de tratamento de esgotos sanitários. Hydraulic and sanitary engineering design for wastewater treatment plants. 53p.

Aven, T. (2010). On how to define, understand and describe risk. Reliability Engineering and System Safety, 95(6), 623–631.

Aven,T. (2016). Risk assessment and risk management: Review of recent advances on their foundation. European Journal of Operational Research, 253(1), 1–13.

Baloi, D., & Price, A.D. (2003). Modelling global risk factors affecting construction cost performance. International Journal of Project Management, 21(4), 261–269.

Barlow, J. (2000). Innovation and learning in complex offshore construction projects. Research Policy, 29(7–8), 973–989.

Berssaneti, F.T., & Carvalho, M.M. (2015). Identification of variables that impact project success in Brazilian companies. International Journal of Project Management, 33(3), 638¬–649.

Boateng, P., Chen, Z., & Ogunlana, S.O. (2015). An Analytical Network Process model for risks prioritisation in megaprojects. International Journal of Project Management, 33(8), 1795–1811.

Brookes, J. (2014). Mankind and Mega-projects. Frontiers of Engineering Management, 1(3), 241–245.

Buckley, J.J., Feuring,T., & Hayashi,Y. (2001). Fuzzy hierarchical analysis revisited. European Journal of Operational Research, 129(1), 48–64.

Carbonara, N., Costantino, N., Pellegrino, R. (2014). Concession period for PPPs: A win-win model for a fair risk sharing. International Journal of Project Management, 32(7), 1223–1232.

Carvalho, M.M., Patah, L.A., & Bido, D.S. (2015). Project management and its effects on project success: Cross-country and cross-industry comparisons. International Journal of Project Management, 33(7), 1509–1522.

Carvalho, M.M., & Rabechini Junior, R. (2015). Impact of risk management on project performance: the importance of soft skills. International Journal of Production Research, 53(2), 321–340.

Chan, D.W.M., Chan, A.P.C., Lam, P.T.I., Yeung, J.F.Y., & Chan, J.H.L. (2011). Risk ranking and analysis in target cost contracts: Empirical evidence from the construction industry. International Journal of Project Management, 29(6), 751–763.

Chapman, C. (2006). Key points of contention in framing assumptions for risk and uncertainty management. International Journal of Project Management, 24(4), 303–313.

Chapman, R.J. (2001). The Controlling Influences on Effective Risk Identification and Assessment for Construction Design Management. International Journal of Project Management, 19(19), 147–160.

Chen, C.-T., & Cheng, H.-L. (2009). A comprehensive model for selecting information system project under fuzzy environment. International Journal of Project Management, 27(4), 389 –

Chen, P., & Wang, J. (2009). Application of a Fuzzy AHP Method to Risk Assessment of International Construction Projects. International Conference on Electronic Commerce and Business Intelligence, 459–462.

Chen, S.-M., & Sanguansat, K. (2011). Analyzing fuzzy risk based on a new fuzzy ranking method between generalized fuzzy numbers. Expert Systems with Applications, 38(3), 2163–2171. http://doi.org/10.1016/j.eswa.2010.08.002

Chou, J.-S., & Yang, J.-G. (2012). Project management knowledge and effects on construction project outcomes: An empirical study. Project Management Journal, 43(5), 47–67.

Chou, J.-S., Pham, A.-D., & Wang, H. (2013). Bidding strategy to support decision-making by integrating fuzzy AHP and regression-based simulation. Automation in Construction, 35, 517–527.

De Bakker, K., Boonstra, A., & Wortmann, H. (2011). Risk management affecting IS/IT project success through communicative action. Project Management Journal, 42(3), 75–90.

Dey, K. (2002). Project Risk Management: A Combined Analytic Hierarchy Process and Decision Tree Approach. Cost Engineering, 44(3), 13–26.

Dey, K. (2012). Project risk management using multiple criteria decision-making technique and decision tree analysis: A case study of Indian oil refinery. Production, Planning and Control, 23(12), 903–92.

Dutra, C.C, Ribeiro, J.L.D., & Carvalho, M.M. (2014). An economic-probabilistic model for project selection and prioritization. International Journal of Project Management, 32(6), 1042–1055.

Eisenhardt, K.M., & Graebner, M.E. (2007).Theory building from cases: opportunities and challenges. Academy of Management Journal, 50(1), 25–32.

El-Kholy, A.M. (2015). Predicting Cost Overrun in Construction Projects. International Journal of Construction Engineering and Management, 4(4), 95–105.

Flyvbjerg, B. (2014). What You Should Know about Megaprojects and Why: An Overview. Project Management Journal, 45(2), 6–19.

Funo, K.A., Muniz Junior, J., & Marins, F.A.S. (2013). Fatores de risco em cadeia de suprimentos do setor aeroespacial: aspectos qualitativos e quantitativos. Produção, 23(4), 832–845.

Hanaoka, S., & Palapus, H.P. (2012). Reasonable concession period for build-operate-transfer road projects in the Philippines. International Journal of Project Management, 30(8), 938–949.

Hwang, B-G., Zhao, X., & Toh, L.P. (2014). Risk management in small construction projects in Singapore: Status, barriers and impact. International Journal of Project Management, 32(1), 116–124.

Iyer, K.C., & Sagheer, M. (2010). Hierarchical Structuring of PPP Risks Using Interpretative Structural Modeling. Journal of Construction Engineering and Management, 136(2), 151–159.

Khazaeni, G., Khanzadi, M., & Afshar, A., (2012). Fuzzy adaptive decision making model for selection balanced risk allocation. International Journal of Project Management, 30(4), 511–

Kuo, Y.-C., & Lu, S.-T. (2013). Using fuzzy multiple criteria decision making approach to enhance risk assessment for metropolitan construction projects. International Journal of Project Management, 31(4), 602–614.

Kutsch, E., & Hall, M. (2010). Deliberate ignorance in project risk management. International Journal of Project Management, 28(3), 245–255.

Liou, F.-M., Huang C.-P., & Chen, B. (2012). Modeling Government Subsidies and Project Risk for Financially Non-Viable Build-Operate-Transfer (BOT) Projects. Engineering Management Journal, 24(1), 58–64.

Liu, J., Li, Q., & Wang, Y. (2013). Risk analysis in ultra-deep scientific drilling project: A fuzzy synthetic evaluation approach. International Journal of Project Management, 31(3), 449–458.

Liu, J., Jin, F., Xie, Q., & Skitmore, M. (2017). Improving risk assessment in financial feasibility of international engineering projects: A risk driver perspective. International Journal of Project Management, 35(2), 204–211.

Millet, I.D.O., & Wedley, W.C. (2002). Modelling risk and uncertainty with the analytic hierarchy process. Journal of Multi-Criteria Decision Analysis, 11(2), 97–107.

Mustafa, M., & Al-Bahar, J. (1991). Project risk assessment using the analytic hierarchy process. IEEE Transactions on Engineering Management, 38(1), 46–52.

Nasirzadeh, F., Khanzadi, M., & Rezaie, M. (2014). Dynamic modeling of the quantitative risk allocation in construction projects. International Journal of Project Management, 32(3), 442–451.

Nieto-Morote, A., & Ruz-Vila, F.A. (2011). Fuzzy approach to construction project risk assessment. International Journal of Project Management, 29(2), 220–231.

Odimabo, O.O., & Oduoza, C.F. (2013). Risk Assessment Framework for Building Construction Projects in Developing Countries. International Journal of Construction Engineering and Management, 2(5), 143–154.

Palisade. (2014). @Risk 7.0, Ithaca NY: Palisade Corporation. www.palisade.com

Pech, G., & Ribeiro, C.A.B. (2013). Sete Lacunas do “Modelo Padrão” de Gerenciamento de Riscos. Anais do IX Congresso Nacional de Excelência em Gestão - CNEG, Rio de Janeiro. http://www.inovarse.org/artigos-por-edicoes/IX-CNEG-2013/

PMI. (2012) A Guide to the Project Management Body of Knowledge. Project Management Institute (PMI). 5th ed. Newtown Square, PA.

Qazi, A., Quigley, J., Dickson, A., & Kirytopoulos, K. (2016). Project Complexity and Risk Management (ProCRiM): Towards modelling project complexity driven risk paths in construction projects. International Journal of Project Management, 34(7), 1183–1198.

Saaty, T.L. (1977). A scaling method for priorities in hierarchical structures. Journal of Mathematical Psychology, 15(3), 234–281.

Saaty, T.L. (1980). The Analytic Hierarchy Process: Planning, Priority, Setting, Resource Allocation. McGraw-Hill, London: England.

Saaty, T.L. (1986). Axiomatic foundations of the analytic hierarchy process. Management Science, 32(7), 841–855.

Saaty, T.L. (1987). Risk—Its priority and probability: The analytic hierarchy process. Risk Analysis,7(2), 159–172.

Saaty, T. L. (1991). Some Mathematical Concepts of the Analytic Hierarchy Process. Behaviormetrika, 18(29), 1–9. http://doi.org/10.2333/bhmk.18.29_1

Saaty, T.L., & Vargas, L.G. (2007). Dispersion of group judgments. Mathematical and Computer Modelling, 46(7–8), 18–925

Shen, L. Y. (1997). Project risk management in Hong Kong. International Journal of Project Management, 15(2), 101-105.

Subramanian, N., & Ramanathan, R. (2012). A review of applications of Analytic Hierarchy Process in operations management. International Journal of Production Economics, 138(2), 215–241.

Taroun, A. (2014). Towards a better modelling and assessment of construction risk: Insights from a literature review. International Journal of Project Management, 32(1), 101–115.

TCU – Tribunal de Contas da União (2013). Obras Públicas. Recomendações Básicas para a Contratação e Fiscalização de Obras de Edificações Públicas. 3ª Ed. Brasília. www.tcu.gov.br

Thamhain, H. (2013). Managing Risks in Complex Projects. Project Management Journal, 44(2), 20–35.

Touran, A., & Lopez, R. (2006). Modeling Cost Escalation in Large Infrastructure Projects. Journal of Construction Engineering and Management, 132(8), 853–860.

Tran, D.Q., & Molenaar, K.R. (2014). Impact of Risk on Design-Build Selection for Highway Design and Construction Projects. Journal of Construction Engineering and Management, 30(2), 153–162.

Turkulainen, V., Aaltonen, K., & Lohikoski, P. (2015). Managing Project Stakeholder Communication: The Qstock Festival Case. Project Management Journal, 46(6), 74–91.

Vanhoucke, M. (2012). Measuring the efficiency of project control using fictitious and empirical project data. International Journal of Project Management, 30(2), 252–263.

Wang, J., & Yuan, H. (2011). Factors affecting contractors' risk attitudes in construction projects: Case study from China. International Journal of Project Management, 29(2), 209–219.

Wang, T., Wang, S., Zhang, L., Huang, Z., & Li, Y. (2016). A major infrastructure risk-assessment framework: Application to a cross-sea route project in China. International Journal of Project Management, 34(7), 1403-1415.

Wang, X., & Huang, J. (2006). The relationships between key stakeholders’ project performance and project success: Perceptions of Chinese construction supervising engineers. International Journal of Project Management, 24(3), 253–260.

Ward, S., & Chapman, C. (2008). Stakeholders and uncertainty management in projects. Construction Management and Economics, 26(6), 563–577.

Wu, Y., & Mao, C. (2015). Cost risk management of key chain in engineering construction project. International Conference on Education, Management and Computing Technology, 1595–1600.

Yang, R. J., & Zou, X. W. (2014). Stakeholder-associated risks and their interactions in complex green building projects: A social network model. Building and Environment, 73, 208–222.

Yaraghi, N., Tabesh, P., Guan, P., & Zhuang, J. (2015). Comparison of AHP and Monte Carlo AHP under different levels of uncertainty. IEEE Transactions on Engineering Management, 62(1), 122–132.

Zavadskas, E.K., Turskis, Z., & Tamošaitiene, J. (2010). Risk assessment of construction projects. Journal of Civil Engineering and Management, 16(1), 33–46.

Zayed, T., Amer, M., & Pan, J. (2008). Assessing risk and uncertainty inherent in Chinese highway projects using AHP. International Journal of Project Management, 26(4), 408–419.

Zhang, H. (2011). Two schools of risk analysis: A review of past research on project risk. Project Management Journal, 42(4), 5–18.

Zhao, X., Hwang, B-G., & Yu, G.S. (2013). Identifying the critical risks in underground rail international construction joint ventures: Case study of Singapore. International Journal of Project Management, 31(4), 554–566.

Zhao, Z.Y., Lei, Q., Zuo, J., Zillante, G. (2010). Prediction System for Change Management in Construction Project. Journal of Construction Engineering and Management, 136(6), 659–669.

Zou, X.W., Zhang, G., & Wang, J. (2007). Understanding the key risks in construction projects in China. International Journal of Project Management, 25(6), 601–614.


Full Text: PDF

Refbacks

  • There are currently no refbacks.




______________________________________________________________________________

The Journal of Modern PM (ISSN: 2317-3963) | info@journalmodernpm.com