Exploring the Context of Price Quotation on Design Projects
Keywords:
Design, Pricing Theory, Time-Dependent Scheduling, Project Management, Cost Estimating, Survey, Professional Community, Price, Quotation, KnowledgeAbstract
Information about the process of price quotation in design projects was collected through in-depth interviews with experts in the field and a survey of design professionals. Content analysis was applied to the transcripts of 13 interviews and revealed four dimensions whose inclusion in the process adds robustness to time estimates during the process of price quotation on design projects. The correlations among these dimensions were evaluated through the application of a survey that resulted in 427 valid responses. The results indicated that the entire professional community reinforced the need to observe them to ensure greater assertiveness in the studied processes.
References
Abdel-Hamid, T.K. and Madnick, S.E. (1986) 'Special feature: impact of schedule estimation on software project behavior', IEEE Software, Vol. 3 No. 4, pp.70-75
Adair, J.E. (2013) Develop your Leadership Skill, 2nd ed., Kogan Page Limited, London, UK.
Anbari, F.T. (2004) 'Earned value project management method and extensions', IEEE Engineering Management Review, Vol. 32 No. 3, pp.97-97
Araujo, C.S. et al. (1996) 'The utilization of product development methods: a survey of UK industry', Journal of Engineering Design, Vol. 7 No. 3, pp.265-277
Bardin, L. (2000) Análise de Conteúdo, Edições, Lisboa.
Bashir, H.A. and Thomson, V. (2001a) 'An analogy-based model for estimating design effort', Design Studies, Vol. 22 No. 2, pp.157-167
Bashir, H.A. and Thomson, V. (2001b) 'Models for estimating design effort and time', Design Studies, Vol. 22 No. 2, pp.141-155
Bossidy, L. and Charan, R. (2002) Execution: The Discipline of Getting Things Done, Crown Publishing Group Business, New York, NY.
Browning, T.R. (1998) Modeling and Analyzing Cost, Schedule, and Performance in Complex System Product Development, Massachusetts Institute of Technology, Boston, MA.
Bruce, M., Cooper, R. and Vazquez, D. (1999) 'Effective design management for small businesses', Design Studies, Vol. 20 No. 3, pp.297-315
Canadian Construction Association. (2012) Guide to Cost Predictability in Construction: An Analysis of Issues Affecting the Accuracy of Construction Cost Estimates, Canadian Construction Association, Canada.
Caron, F., Ruggeri, F. and Pierini, B. (2016) 'A Bayesian approach to improving estimate to complete', International Journal of Project Management, Vol. 34 No. 8, pp.1687-1702
Chen, H.L., Chen, W.T. and Lin, Y.L. (2016) 'Earned value project management: improving the predictive power of planned value', International Journal of Project Management, Vol. 34 No. 1, pp.22-29
Chou, J.-S. and Wu, C.-C. (2013) 'Estimating software project effort for manufacturing firms', Computers in Industry, Vol. 64 No. 6, pp.732-740
Cioffi, D.F. (2006) 'Completing projects according to plans: an earned-value improvement index', Journal of the Operational Research Society, Vol. 57 No. 3, pp.290-295
Cleland, D.I. and Gareis, R. (2006) Global Project Management Handbook: Planning, Organizing, and Controlling International Project, 2nd ed., McGraw-Hill, New York, NY.
Corfield, S.K. (1984) 'Translating planning into action', Long Range Planning, Vol. 17 No. 5, pp.23-24
Cross, N. (2008) Engineering Design Methods: Strategies for Product Design, 4th ed., Wiley, Hoboken, NJ.
Elragal, A. and Haddara, M. (2010) 'The use of experts panels in ERP cost estimation research', in Varajão, J.E.Q. et al (Eds.), ENTER Prise Information Systems, Springer, Berlin, Heidelberg, pp.97-108.
Flyvbjerg, B. (2009) 'Survival of the unfittest: why the worst infrastructure gets built–and what we can do about it', Oxford Review of Economic Policy, Vol. 25 No. 3, pp.344-367
Hellenbrand, D., Helten, K. and Lindemann, U. (2010) 'Approach for development cost estimation in early design phases' in DS 60: Proceedings of DESIGN 2010, the 11th International Design Conference, Dubrovnik, Croatia, pp. 779-788.
Hogarth, R.M. and Makridakis, S. (1981) 'Forecasting and planning: an evaluation', Management Science, Vol. 27 No. 2, pp.115-138
Hölttä, K.M.M. and Otto, K.N. (2005) 'Incorporating design effort complexity measures in product architectural design and assessment', Design Studies, Vol. 26 No. 5, pp.463-485
Kahneman, D. and Tversky, A. 'Intuitive prediction: biases and corrective procedures.' DTIC Document [online] http://oai.dtic.mil/oai/oai?verb=getRecord&metadataPrefix=html&identifier=ADA047747.
Kim, D.S., Porter, J.D. and Buddhakulsomsiri, J. (2008) 'Task time estimation in a multi-product manually operated workstation', International Journal of Production Economics, Vol. 114 No. 1, pp.239-251
Kumar, P.P. (2008) Design Process Modeling: Towards an Ontology of Engineering Design Activities, Clemson University, Clemson, SC.
Larson, E.W. and Gray, C.F. (2011) Project Management: The Managerial Process, 5th ed., McGraw-Hill, New York, NY.
Lester, A. (2003) Project Planning and Control, 4th ed., Zentrum Verlagsgesellschaft, Oxford, UK.
Li, M.Q. et al. (2015) 'Simulation-based experimental design and statistical modeling for lead time quotation', Journal of Manufacturing Systems, Vol. 37, pp.362-374
Lipke, W. et al. (2009) 'Prediction of project outcome', International Journal of Project Management, Vol. 27 No. 4, pp.400-407
Little, S.E. (1987) 'The role of time frames in design decision-making', Design Studies, Vol. 8 No. 3, pp.170-182
McCulla, P. (1989) 'The estimating process', International Journal of Project Management, Vol. 7 No. 1, pp.36-38
Morog, J.V. (2003) Architect’s Handbook for Professional Practice, American Institute of Architects, Washington, DC.
Mortaji, S.T.H., Noorossana, R. and Bagherpour, M. (2015) 'Project completion time and cost prediction using change point analysis', Journal of Management in Engineering, Vol. 31 No. 5, pp.04014086
Mousavi, S.M. et al. (2013) 'A new support vector model-based imperialist competitive algorithm for time estimation in new product development projects', Robotics and Computer-Integrated Manufacturing, Vol. 29 No. 1, pp.157-168
Nijssen, E.J. and Lieshout, K.F.M. (1995) 'Awareness, use and effectiveness of models and methods for new product development', European Journal of Marketing, Vol. 29 No. 10, pp.27-44
Oxford Dictionary. 'Oxford English dictionary.' [online] https://en.oxforddictionaries.com/definition/estimate.
Pahl, G. and Beitz, W. (2007) Engineering Design: A Systematic Approach, 3rd ed., Springer, London, UK.
Pozatti, M. (2015) Implementação de Métodos de Design Orientados à Inovação em Empresas Desenvolvedoras de Produtos: Convergências Entre Teoria e Prática. Mestrado, UFRGS - Universidade Federal do Rio Grande do Sul, Brasil.
Project Management Institute. (2013) A Guide to the Project Management Body of Knowledge: PMBOK® Guide, 5th ed., Project Management Institute, Newtown Square, PA.
Rittel, H.W.J. and Webber, M.M. (1973) 'Dilemmas in a general theory of planning', Policy Sciences, Vol. 4 No. 2, pp.155-169
Salam, A. and Bhuiyan, N. (2016) 'Estimating design effort using parametric models: a case study at Pratt & Whitney Canada', Concurrent Engineering, Vol. 24 No. 2, pp.129-138
Salam, A. et al. (2009) 'Estimating design effort for the compressor design department: a case study at Pratt & Whitney Canada', Design Studies, Vol. 30 No. 3, pp.303-319
Seidel, V.P. and Fixson, S.K. (2013) 'Adopting design thinking in novice multidisciplinary teams: the application and limits of design methods and reflexive practices', Journal of Product Innovation Management, Vol. 30, No. 1, pp.19-33
Serrat, J., Lumbreras, F. and López, A.M. (2013) 'Cost estimation of custom hoses from STL files and CAD drawings', Computers in Industry, Vol. 64 No. 3, pp.299-309
Subramanian, G.H. and Breslawski, S. (1995) 'An empirical analysis of software effort estimate alterations', Journal of Systems and Software, Vol. 31 No. 2, pp.135-141
Tyagi, S., Cai, X. and Yang, K. (2015) 'Product life-cycle cost estimation: a focus on the multi-generation manufacturing-based product', Research in Engineering Design, Vol. 26 No. 3, pp.277-288
Vanhoucke, M. and Vandevoorde, S. (2005) A Simulation and Evaluation of Earned Value Metrics to Forecast the Project Duration, Ghent University, Faculty of Economics and Business Administration, Ghent, Belgium.
Downloads
Published
Issue
Section
License
Copyright (c) 2022 Maurício Moreira e Silva Bernardes, Henrique Benedetto, Milena Chang Chain, Darli Rodrigues Vieira

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.