1.
Shahad Ibrahem Ahmed, Ahmed Hasoon, Husam Abdulkadhim Raheema, Noor Qusai, Barzan Munshed Salih, Mostafa Hsan Elwan, et al. THE INTERRELATIONSHIP BETWEEN PROJECT COST CONTROL SYSTEM AND ENABLERS: A STUDY ON IRAQ CONSTRUCTION INDUSTRY. JMPM [Internet]. 2023 Mar. 20 [cited 2024 May 19];10(2):374-83. Available from: https://journalmodernpm.com/manuscript/index.php/jmpm/article/view/562