Testing risk management decision making competency of project managers in a crisis

Authors

  • Kenneth David Strang W3-Research, USA,
  • Narasimha Rao Vajjhala American University of Nigeria

DOI:

https://doi.org/10.19255/JMPM02904

Keywords:

Project management, Risk management, Project manager, Decision making, Crisis, Project failure, Repeated measures ANOVA, Experiment, MANOVA.

Abstract

The objective of the current study was to use a rigorous controlled experiment simulating a project failure to measure how cognitive bias and competency impact a PM’s risk management decision making in a crisis while controlling for other project and firm level variables including lying or faking responses. The MANOVA, repeated measures ANOVA controlled experiment and post-hoc analysis techniques were rigorous because the study took place in approximately the same point in time and each participant received all treatments. The 24 respondents in these repeated measures experiment outperforms most psychology factorial research design, which would require a 4 x 24 = 96 sample size to accommodate 3 treatments and a control group. We found bias significantly impacted PM risk management decision making in a crisis, but certification and competency resulted in the best decisions. Generalizations are cautioned due to the exploratory nature of this study. However, the literature review and methods were articulated well enough to encourage replications and extensions by other researchers.

References

Anthopoulos, L., Reddick, C. G., Giannakidou, I., & Mavridis,N. (2016). Why e-government projects fail? An analysisof the Healthcare. gov website. Government informationquarterly, 33(1), 161-173. https://doi.org/10.1016/j.giq.2015.07.003

Barrows, M., Clevenger, C. M., Abdallah, M., & Wu, W.(2020). Value of certifications when seeking constructionemployment. International Journal of ConstructionEducation and Research, 16(1), 61-79. https://doi.org/10.1080/15578771.2019.1575936Bohnert, A., Gatzert, N., Hoyt, R. E., & Lechner, P. (2019).

The drivers and value of enterprise risk management:evidence from ERM ratings. The European Journal ofFinance, 25(3), 234-255. https://doi.org/10.1080/1351847X.2018.1514314Borbath, M., Blessner, P., & Olson, B. (2019). An empiricalapproach to the evaluation of defence contractor

performance. International Journal of Logistics Researchand Applications, 22(2), 138-153. https://doi.org/10.1080/13675567.2018.1497148

Brandon, T. P., Allen, B. M., & Menefee, S. J. (2022). WhichExperience Factors Predict Overall Expertise and PercentSuccess? The Journal of Modern Project Management,9(3), 20-31. https://journalmodernpm.com/index.php/jmpm/article/download/JMPM02802/8Callahan, C., & Soileau, J. (2017). Does enterprise risk

management enhance operating performance? Advancesin accounting, 37, 122-139. https://doi.org/10.1016/j.adiac.2017.01.001

Carlton, D., & Peszynski, K. (2018). SituationalIncompetence: the failure of governance in the managementof large scale IT projects. International Working Conferenceon Transfer and Diffusion of IT (pp. 224-244). Springer.https://doi.org/10.1007/978-3-030-04315-5_16

Conner, M., Godin, G., Sheeran, P., & Germain, M.(2013). Some feelings are more important: cognitive

attitudes, affective attitudes, anticipated affect, and blooddonation. Health Psychology, 32(3), 264–272. https://doi.org/10.1037/a0028500

CSOTC. (2017). Enterprise Risk Management: AligningRisk with Strategy and Performance. New York, NY:Committee of Sponsoring Organizations of the Treadway

Commission (CSOTC).Damoah, I. S., Akwei, C. A., Amoako, I. O., & Botchie,D. (2018). Corruption as a source of government project

failure in developing countries: Evidence from Ghana.Project Management Journal, 49(3), 17-33. https://doi.org/10.1177%2F8756972818770587

Eckerd, A., & Snider, K. (2017). Does the program managermatter? New public management and defense acquisition.The American Review of Public Administration, 47(1), 36-57. https://doi.org/10.1177%2F0275074015596376

Elbanna, S., & Child, J. (2007). The influence of decision,environmental and firm characteristics on the rationalityof strategic decision‐making. Journal of ManagementStudies, 44(4), 561-591. https://doi.org/10.1111/j.1467-6486.2006.00670.xGhossein, T., Islam, A. M., & Saliola, F. (2018).Public Procurement and the Private Business Sector:Evidence from Firm-Level Data. World Bank. https://doi.org/10.1596/1813-9450-8575

Goodwin, Y., & Strang, K. D. (2012). Socio-cultural andmulti-disciplinary perceptions of risk. International Journalof Risk and Contingency Management (IJRCM), 1(1), 1-11.http://doi.org/10.4018/ijrcm.2012010101Goyal, P., Gupta, P., & Yadav, V. (2021). Antecedents toheuristics: decoding the role of herding and prospecttheory for Indian millennial investors. Review of BehavioralFinance. https://doi.org/10.1108/RBF-04-2021-0073Hughes, D. L., Rana, N. P., & Simintiras, A. C. (2017). Thechanging landscape of IS project failure: an examinationof the key factors. Journal of Enterprise Information

Management, 30(1), 142-165. https://doi.org/10.1108/JEIM-01-2016-0029

Jennings, W., Lodge, M., & Ryan, M. (2018). Comparingblunders in government. European Journal of PoliticalResearch, 57(1), 238-258. https://doi.org/10.1111/1475-6765.12230

Jordão, A. R., Costa, R., Dias, Á. L., Pereira, L., & Santos,J. P. (2020). Bounded rationality in decision making: an

analysis of the decision-making biases. Verslas: teorija ir praktika, 21(2), 654-665. http://dx.doi.org/10.3846/

btp.2020.11154

Kahneman, D., & Tversky, A. (1979). Prospect Theory: AnAnalysis of Decision under Risk. Econometrica, 47(2), 263-292. https://doi.org/10.2307/1914185

Klein, D. E., Woods, D. D., Klein, G., & Perry, S. J. (2016).Can we trust best practices? Six cognitive challengesof evidence-based approaches. Journal of CognitiveEngineering and Decision Making, 10(3), 244-254. https://doi.org/10.1177%2F1555343416637520

Korstanje, M. E., Strang, D. K., Tzanelli, R., & MorenoGarcia, R. (2020). Turismo, riesgo y cambio climático: Uncamino alternativo. Estudios y perspectivas en turismo,29(1), 214-227. http://www.estudiosenturismo.com.ar/PDF/V29/N01/v29n1a12%20res.pdf

Kurek, E., Johnson, J., & Mulder, H. (2017). Measuring thevalue of Enterprise Architecture on IT projects with CHAOSResearch. Systems, Cybernetics, and Informatics, 15, 13-18. http://dx.doi.org/10.13140/RG.2.2.21487.12966Masticola, S. P. (2007). A simple estimate of the cost of

software project failures and the breakeven effectivenessof project risk management. 2007 First InternationalWorkshop on the Economics of Software and Computation(pp. 6-6). IEEE. https://doi.org/10.1109/ESC.2007.1McShane, M. (2018). Enterprise risk management: historyand a design science proposal. The Journal of RiskFinance, 19(2), 137-153. https://doi.org/10.1108/JRF-03-2017-0048

O’Boyle, E., Banks, G. C., Carter, K., Walter, S., & Yuan,Z. (2019). A 20-year review of outcome reporting bias inmoderated multiple regression. Journal of Business andPsychology, 34(1), 19-37. https://doi.org/10.1007/s10869-018-9539-8Pace, M. (2019). A correlational study on projectmanagement methodology and project success. Journal ofEngineering, Project, and Production Management, 9(2),56-65. http://dx.doi.org/10.2478%2fjeppm-2019-0007

Prewett, K., & Terry, A. (2018). COSO’s updated enterpriserisk management framework—A quest for depth and clarity.Journal of Corporate Accounting & Finance, 29(3), 16-23.https://doi.org/10.1002/jcaf.22346Raftery, J. (1994). Risk Analysis in Project Management.First UK: E & FN Spon An imprint of Routledge.Tapas, P., & Pillai, D. (2021). Prospect theory: an analysisof corporate actions and priorities in pandemic crisis.International Journal of Innovation Science. https://doi.org/10.1108/IJIS-10-2020-0241

Tversky, A., & Kahneman, D. (1992). Advances inprospect theory: Cumulative representation of uncertainty.Journal of Risk and uncertainty, 5(4), 297-323. https://doi.org/10.1007/BF00122574

Downloads

Published

2022-06-14

How to Cite

Strang, K. D. ., & Vajjhala, N. R. (2022). Testing risk management decision making competency of project managers in a crisis. The Journal of Modern Project Management, 10(1), 52–71. https://doi.org/10.19255/JMPM02904