Handling Risk and Uncertainty in Project Planning
Keywords:
Project planning, risk, uncertainty, agilityAbstract
There are basically three avenues for dealing with risk and uncertainty in project planning as – 1) forecast its impact before making a decision, 2) maneuver or adapt to uncertainty and risks that materializes and thus making it irrelevant, or 3) accept it. To discuss this the very definitions of uncertainty and risk are revisited because there is great confusion about uncertainty and its cousin risk – also in the literature. Once a proper distinction between these two concepts are established, the paper will show that if project planning is contemplated as ‘planning for coordination’ we can augment it with agility to handle surprises, which is in contradistinction with the ‘planning the future’ approach which is path dependent and fails to handle surprises.
References
Abdelhamid, T. S., M. A. El-Gafy and O. Salem (2008). "Lean construction: Fundamentals and principles." The American Professional Constructor Journal 32(2):pp. 8-19.
Allvine, F. (1996). Marketing: Principles and Practices. Boston, MA, Irwin/McGraw-Hill.
Arrow, K. J. (1992). I Know a Hawk from a Handsaw. Eminent Economists: Their Life and Philosophies. M. Szenberg. Cambridge, Cambridge University Press:pp. 42-50.
Austin, J. L. (1975). How to Do Things With Words. Cambridge, MA, Harvard University Press.p. 169.
Baldoni, J. (2004). Avoiding Miscommunications. Darwin Magazine:pp. www.darwinmag.com.
Ballard, H. G. (2000). The Last Planner System of Production Control. Faculty of Engineering. Birminghan, The University of Birmingham. PhD Dissertation:pp. 191.
Ballard, H. G. and G. A. Howell (1994). Stabilizing Work Flow. Proceedings of the 2nd Annual Conference of the International Group for Lean Construction. Santiago, Chile:pp. 101-110.
Ballard, H. G. and G. A. Howell (1998). "Shielding Production: Essential Step in Production Control." Journal of Construction Engineering and Project Management 124(1):pp. 11-17.
Bernstein, P. L. (1996). Against the Gods: the Remarkable Story of Risk. New York, John Wiley & Sons.p. 383.
Bohm, D. J. (1993). "For Truth Try Dialogue." Resurgence 13(No. 156, January/February):pp. 10-13.
Bohm, D. J. (2004). On Dialogue. London, Routledge.p. 101.
Bonvik, A. M. and S. B. Gershwin (1996). Beyond kanban: creating and analyzing lean shop-floor control policies. Manufacturing and Service Management Conference Proceedings, Hannover, NH.
Cavusgil, S. T., R. J. Calantone and Y. Zhao (2003). "Tacit knowledge transfer and firm innovation capability." Journal of Business & Industrial Marketing 18(1):pp. 6-21.
Cialdini, R. B. (2001). Influence: Science and practice. Upper Saddle River, NJ, Pearson.p. 262.
De Geus, A. P. (1988). "Planning as Learning." Harvard Business Review 66(March-April):pp. 70-74.
Dinero, D. A. (2005). Training Within Industry: The Foundation of Lean. New York, CRC Press.p. 329.
Ejova, A., D. J. Navarro and P. H. Delfabbro (2013). "Success-slop effects on the illusion of control and remembered success-frequency." Judgment and Decision Making 8(4):pp. 498-511.
Ellis, A. K. (2010). Teaching and Learning Elementary Social Studies (9th Edition). London, Pearson.p. 432.
Emblemsvåg, J. (2003). Life-Cycle Costing: Using Activity-Based Costing and Monte Carlo Methods to Manage Future Costs and Risks. Hoboken, NJ, John Wiley & Sons.p. 320.
Emblemsvåg, J. (2010). "The augmented subjective risk management process." Management Decision 48(2):pp. 248-259.
Emblemsvåg, J. (2014a). "Lean project planning in Shipbuilding." Journal of Ship Production and Design 30(2):pp. 79-88.
Emblemsvåg, J. (2014b). "Lean project planning: Using lean principles in project planning." International Journal of Construction Project Management(Accepted for publication).
Emblemsvåg, J. (2015). Reengineering Capitalism 2016 : From Industrial Revolution Towards Sustainable Development. London, Springer.p. 332.
Fleming, Q. W. and J. M. Koppelman (2005). Earned Value Project Management. Newtown Square, PA, Project Management Institute.p. 232.
Gilford, W. E., H. R. Bobbitt and J. W. Slocum jr. (1979). "Message Characteristics and Perceptions of Uncertainty by Organizational Decision Makers." Academy of Management Journal 22(3):pp. 458-481.
Grice, H. P. (1991). Studies in the Way of Words. Cambridge, MA, Harvard University Press.p. 394.
Habermas, J. (2003). On the Pragmatics of Communication. Cambridge, Polity Press.p. 454.
Hines, W. W. and D. C. Montgomery (1990). Probability and Statistics in Engineering and Management Science. New York, John Wiley & Sons, Inc.p. 732.
Honderich, T., Ed. (1995). The Oxford Companion to Philosophy. New York, Oxford University Press.p. 1009.
Hopp, W. J. and M. L. Spearman (2004). "To Pull or Not to Pull: What Is the Question?" Manufacturing & Service Operations Management 6(2 Spring):pp. 133-148.
Hubbard, D. W. (2009). The Failure of Risk Management: Why It's Broken and How to Fix It. Hoboken, NJ, John Wiley & Sons, Inc.p. 281.
Jackson, T. L. (2006). Hoshin Kanri for the Lean Enterprise: Developing Competitive Capabilities and Managing Profit. New York, Productivity Press.p. 206.
Johnson-Laird, P. N. (1983). Mental Models. Cambridge, Cambridge University Press.p. 528.
Jones, M. E. and G. Sutherland (1999). Implementing Turnbull: A Boardroom Briefing. City of London, The Center for Business Performance, The Institute of Chartered Accountants in England and Wales (ICAEW).p. 34.
Kangari, R. and L. S. Riggs (1989). "Construction risk assessment by linguistics." IEEE Transactions on Engineering Management 36(2):pp. 126 - 131.
Kerzner, H. (2013). Project Management: A Systems Approach to Planning, Scheduling, and Controlling. Hoboken, NJ, John Wiley & Sons.p. 1296.
Kim, Y.-W. and H. G. Ballard (2000). Is the Earned Value Method and Enemy of Work Flow? Proceedings of the 8th International Group for Lean Construction Conference, Brighton, UK, International Group for Lean Construction.
Klir, G. J. (1991). "A principal of uncertainty and information invariance." International Journal of General Systems 17:pp. 258.
Klir, G. J. and B. Yuan (1995). Fuzzy Sets and Fuzzy Logic: Theory and Applications. New York, Prentice-Hall.p. 268.
Koskela, L. (1992). Application of the New Production Philosophy to Construction. Standford, CA, Stanford University, Center for Integrated Facility Engineering.p. 75.
Koskela, L. (1999). Management of Production in Construction: A Theoretical View. Proceedings of the 7th Annual Conference of the International Group for Lean Construction. I. D. Tommelein. University of California, Berkeley, CA:pp. 241-252.
Koskela, L. and P. Huovila (1997). On Foundations of Concurrent Engineering. Concurrent Engineering in Construction CEC97. C. Anumba. London, The Institution of Structural Engineers:pp. 22-32.
Langer, E. J. (1975). "The Illusion of Control." Journal of Personality and Social Psychology 32(2):pp. 311-328.
Laufer, A. and R. L. Tucker (1987). "Is construction project planning really doing its job? A critical examination of focus, role and processes." Construction Management and Economics 5(3):pp. 243-266.
Laufer, A. and R. L. Tucker (1988). "Competence and timing dilemma in construction planning." Construction Management and Economics 6(4):pp. 339-355.
Lind, W. S. (1985). Manoeuvre Warfare Handbook. Boulder, CO, Westview Press.p. 152.
Lissack, M. R. and J. Roos (2001). "Be coherent, not visionary." Long Range Plannig 34(1):pp. 53-70.
Marton, F. (1981). "Phenomenography - Describing conceptions of the world around us." Instructional Science 10(2):pp. 177-200.
McNeill, D. and P. Freiberger (1993). Fuzzy Logic. New York, Simon & Schuster.p. 320.
Meyer, B. (2014). Agile! The Good, the Hype and the Ugly. Zurich, Springer International Publishing Switzerland.p. 170.
Morris, A. R. (1993). "Manoeuvre warfare - can the British Army cope?" British Army Review 105(December):pp. 7-15.
Nonaka, I. and H. Takeuchi (1995). The Knowledge-Creating Company: How Japanese Companies Creat the Dynamics of Innovation. New York, Oxford University Press.p. 298.
Nutt, P. (1998). "Leverage, Resistance and the Success of Implementation Approaches." Journal of Management Studies 35(2):pp. 213-240.
Oehmen, J., Ed. (2012). The Guide to Lean Enablers for Managing Engineering Programs, Version 1.0. Cambridge, MA, Joint MIT-PMI-INCOSE Community of Practice on Lean in Program management.p. 202.
Peters, E. E. (1999). Complexity, Risk and Financial Markets. New York, John Wiley & Sons.p. 222.
PMI (2008). A Guide to the Project Management Body Of Knowledge (PMBOK Guide). Newtown Square, PA, Project Management Institute.p. 467.
Polanyi, M. (1966). The Tacit Dimension. New York, Anchor Day Books.p. 108.
Powner, D. A. (2008). OMB And Agencies Need to Improve Planning, Management, and Oversight of Projects Totaling Billions of Dollars. Washington DC, United States Government Accountability Office (GAO).p. 50.
Richards, C. W. (2003). A Swift, Elusive Sword: What If Sun Tzu and John Boyd Did a National Defense Review. Washington DC, Center for Defense Information.p. 88.
Savage, L. J. (2003). The Foundations of Statistics. New York, Dover Publications Inc.p. 310.
Slomp, J., J. A. C. Bokhorst and R. Germs (2009). "A lean production control system for high-variet/low-volume environments: a case study implementation." Production Planning & Control 20(7):pp. 586-595.
Sumara, J. and J. Goodpasture (1997). Earned Value - The Next Generation - A Practical Application for Commercial Projects. Project Management Institute 28th Annual Seminars & Symposium. Chicago, IL, Project Management Institute:pp. 13-17.
Sussland, W. A. (2002). "Connecting the Planners and Doers." Quality Progress(June):pp. 55-61.
Sutherland, J. (2014). The Scrum Handbook. Cambridge, MA, Scrum Inc.p. 86.
Sveiby, K. E. (1997). The New Organizational Wealth - Managing & Measuring Knowledge-Based Assets. Brisbane, Berret-Koehler Publishers, Inc.p. 275.
Taguchi, G., S. Chowdhury and Y. Wu (2005). Taguchi's Quality Engineering Handbook. Hoboken, NJ, John Wiley & Sons.p. 1662.
Tversky, A. and D. Kahneman (1974). "Judgment under Uncertainty: Heuristics and Biases." Science 185(4157):pp. 1124-1131.
Vygotsky, L. S. (1988). Thought and Language. Cambridge MA, The MIT Press.p. 285.
Webster (1989). Webster's Encyclopedic Unabridged Dictionary of the English Language. New York, Gramercy Books.p. 1854.
Yong-Woo, K. and H. G. Ballard (2000). Is the Earned Value Method and Enemy of Work Flow? Proceedings of the 8th annual conference of the International Group for Lean Construction. Brighton:pp. 10.
Downloads
Published
Issue
Section
License
Copyright (c) 2022 Jan Emblemsvag

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.