Risk Management Practice in the Nigerian Petroleum Industry

Authors

  • Zakari Danlami Tsiga Zakari Danlami Tsiga University College London United Kingdom
  • Zayyad Danlami Tsiga University of Nottingham, Ningbo Campus. China

Keywords:

Risk management, risk tools, risk techniques

Abstract

While in developed nations, risk management practises have become a norm in a bid to ensure project success, it is still unclear if its implementation has become common practise in developing nations. The paper aims to explore the current perceptions of risk management specifically in the Nigerian petroleum industry. The industry serves as a good platform to explore risk management in this context as it is the biggest in Africa and contributes significantly to the countries economy. With so much dependence on the industry, it reasons that all possible measures to mitigate risk will be put in place, especially because of the scale of major failures that have been recorded worldwide in the industry. A comprehensive literature review on risk management is carried out and presented. Empirical data is collected using semi-structured qualitative interviews from personnel in the Nigerian National Petroleum Corporation for analyses which is subsequently presented. Findings reveal the major risks commonly experienced in the Nigeria petroleum industry, the primary methods currently employed in the different stages of risk management, and the factors that impede the implementation of more advance risk management tools are identified. The work extends on the knowledge that is currently available on risk management practices in developing nations.

Author Biographies

  • Zakari Danlami Tsiga, Zakari Danlami Tsiga University College London United Kingdom

    MSc is a PhD student working at the University College London.

  • Zayyad Danlami Tsiga, University of Nottingham, Ningbo Campus. China

    PhD candidate at Nottingham University Business School, University of Nottingham Ningbo China. He holds a Bachelors in BusinessInformation Technology from Coventry University and a Masters in Management of Information Technology from the University of Nottingham (Malaysia campus).

References

AlKazimi, M. A., & Grantham, K. (2015). Investigating new risk reduction and mitigation in the oil and gas industry. Journal of Loss Prevention in the Process Industries, 34, 196-208.

Anderson, C. M., & LaBelle, R. P. (1994). Comparative occurrence rates for offshore oil spills. Spill Science & Technology Bulletin, 1(2), 131-141.

Association for Project Management. (2006). APM Body of Knowledge (5th ed ed.). Buckinghamshire.

Chapman, C., & Ward, S. (2003). Project risk management: processes, techniques and insights. John Wiley & Sons. .

Davies, S. (2010). Deep Oil Dilemma [explosion and sinking of Deepwater Horizon]. Engineering & Technology, 5(8), 44-49.

ISO International Standard. (2009). ISO 31000:2009-The New International Standard on Risk Management. ISO 31000:2009.

Kang, B. G., Fazlie, M. A., Goh, B. H., Song, M. K., & Zhang, C. (2015 , November ). Current Practice of Risk Management in the Malaysia Construction Industry–The Process and Tools/Techniques. International Journal of Structural and Civil Engineering Research, 4(4), 371-377.

Murray-Webster, R. (2010). Management of risk. London: TSO (The Stationary Office).

Murray-Webster, R. (2010). Management of risk: guidance for practitioners. The Stationery Office.

Project Management Institute. (2013). A guide to the project management body of knowledge. (P. M. Institute, Ed.) Newtown Square.

Pryke, S., & Smyth, H. (2012). The management of complex projects: A relationship approach. John Wiley & Sons.

Suslick, S., & Schiozer, D. (2004). Risk analysis applied to petroleum exploration and production: an overview. Journal of Petroleum Science and Engineering, 44, 1-9.

Tsiga, Z., Emes, M., & Smith, A. (2017). Critical success factors for projects in the petroleum industry. Procedia Computer Science. 121, pp. 224-231. Elsevier.

Yanting, Z., & Liyun, X. (2011). Research on Risk Management of Petroleum Operations. IACEED (pp. 2330–2334). Energy Procedia 5.

Downloads

Published

2022-05-20

How to Cite

Risk Management Practice in the Nigerian Petroleum Industry. (2022). The Journal of Modern Project Management, 6(2). https://journalmodernpm.com/manuscript/index.php/jmpm/article/view/JMPM01709

Similar Articles

1-10 of 451

You may also start an advanced similarity search for this article.