Effectiveness of SLA Project with Spare Parts Management: The case of a telecom equipment industry
Keywords:
SLA – Service Level Agreement, Telecommunications, Spare Parts Project, Closed-Loop Supply ChainAbstract
Managing a portfolio of customers of telecommunications equipment has several challenges, including the sales of the equipment itself, winning the contract for maintenance, but it is also to maintain the agreed level of service for this contract and give the customer required value to post-sale management. The primary objective of this paper is twofold: 1. Characterize the structure of the logistic cycle of spare parts for telecommunication equipment, underlining the importance of each process and the reasons, which require discipline in the control of every item in stock; 2. Verify the alignment between the decision makers concerning the choice of relevant criteria to assist the decision making on whether or not to acquire certain inventory items.
References
Bacchetti A., Plebani F., Saccani N., & Syntetos A.A. (2013). Empirically-driven hierarchical classification of stock keeping units, International Journal of Production Economics, 143: 263-274.
Blackburn, J.D., Guide, Jr. V.D.R., Souza, G.C., & Van Wassenhove, L.N. (2004). Reverse Supply Chains for Commercial Returns, California Management Review, 46(2).
Bryde D.J., & Robinson (2005). Client versus contractor perspectives on project success criteria, International Journal of Project Management, 23.
Dekker, R., Cerag P., Rob, Z., & Muhammad N.J. (2013). On the use of installed base information for spare parts logistics: A review of ideas and industry practice, International Journal of Production Economics, 143: 536-545.
Fisher, M. (1997, March-April). What is the right supply chain for your product? Harvard Business Review – 75(2): 83-93.
Flapper, S.D.P, van Nunen, J.A.E.E., & Van Wassenhove L.N. (Editors) (2005). Managing Closed-Loop Supply Chains – Springer.
Gelders, L.F., van Looy, P.M., (1978). An inventory policy for slow and fast movers in a petrochemical plant: A case study. Journal of the Operational Research Society 29(9): 867–874.
Guide, V.D.R. Jr., Van Wassenhove L.N. (2009, January-February). The evolution of closed-loop supply chain research, Operations Research, 57(1): 10–18.
Kukreja, A., Schmidt, C.P. (2005, August). A model for lumpy demand parts in a multi-location inventory system with transshipments, Computers & Operations Research, 32(8): 2059-2075.
Porras, E., Dekker, R. (2008, January 1). An inventory control system for spare parts at a refinery: An empirical comparison of different re-order point methods, European Journal of Operational Research, 184(1): 101-132.
Shapiro, J.F. (2007). Modeling the supply-chain, Thompson Higher Education.
Thamsain H. (2013). Managing risks in complex projects, Project Management Journal, April.
Vereecke, A., Verstraeten, P. (1994, June). An inventory management model for an inventory consisting of lumpy items, slow movers and fast movers, International Journal of Production Economics, 35(1-3): 379-389.
Vieira D.R., Bouras A., e Debaecker D. (2013). Gestão de projeto do produto. Baseada na metodologia Product Lifecycle Management (PLM), Ed. Elsevier, SP.
Yin, R.K. (2009). Case study research: design and methods, 4th Edition, Sage Publications.
Downloads
Published
Issue
Section
License
Copyright (c) 2022 Lebhon Régis Guimarães, José Eduardo Pécora Junior, Darli Rodrigues Vieira

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.