The challenge of monitoring PPP projects: Proposal of a conceptual 5-dimension KPI’s model
Keywords:
Concessions, Contract Management, Public-Private Partnerships, Key Performance IndicatorsAbstract
Public-private partnerships (PPPs) have been used worldwide in infrastructure and public service provision as an alternative procurement model to traditional public work contracts. There are several benefits arising from the use of PPPs such as greater efficiency and value for money, but there is a pitfall that has significantly affected its performance: the lack of adequate monitoring by public authorities. This led to excessive renegotiations and problems of information asymmetry. Contract management remains as one of the main challenges in the PPP domain, if not the most relevant. This paper intends to minimize this gap, proposing a framework for key performance indicators (KPIs) categories that should be integrated in these contracts, enabling the grantor to effectively monitor the performance of the projects thus reducing information asymmetry problems. The KPIs category model proposed in this article congregates five groups of KPIs: operational indicators, financial indicators, relational indicators, environmental indicators and social indicators.
References
Ps. (2007) A Guide to Contract Management for PFI and PPP Projects, (July 10, 2012).
Aje, I., Adeniyi, O. (2012) “Performance Indicators for Public-Private Partnership in Infrastructure.” International Conference: Delivering Value for the Community, University of Cape, South Africa, 462-471.
Carpintero, S., Petersen, O. H. (2014) “PPP projects in transport: evidence from light rail projects in Spain”. Public Money Manag., 31(1) 43-50.
Cruz, C. O., Marques, R. (2012) “O Estado e as Parcerias Público-Privadas.” Sílabo, Lisbon.
Cruz, C.O., Marques, R. C. (2013) “Exogenous determinants for renegotiation of public infrastructure concessions” J Construct Eng Manag, 139(9), 1082-1090.
FHWA. (2009) Public-Private Partnerships for Highway Infrastructure: Capitalizing on International Experience, (Feb. 12, 2012).
FHWA. (2011) Key Performance Indicators in Public-Private Partnerships: A State-of-the-Practice Report, (Feb. 12, 2012).
Ismail, S. B. (2009) “Key Performance Indicators in Private Finance Initiative.” Ph.D. thesis, Faculty of Civil Engineering, Universiti Teknologi Malaysia.
Luu, T., Kim, S., Cao, H., and Parka, Y. (2008) “Performance measurement of construction firms in developing countries.” Constr. Manage. and Econ., 26(4), 373-386.
NAO. (2008) Making Changes in Operational PFI Projects, (June 10, 2012).
Partnerships Victoria. (2003) Contract Management Guide, (Aug. 8, 2012).
Pavlov, A. (2010) “Reviewing performance or changing routines? An Analysis of the Experience of Participants in Performance Management Review Meetings.” Ph.D. thesis, School of Management at Cranfield University.
Shaoul, J. (2003) “A critical financial analysis of the Private Finance Initiative: selecting a financing method or allocating economic wealth?.” Journal of Critical Perspectives on Accounting, 16(4), 441-471.
Simeone, R., Carnevale, J., and Millar, A. (2005) “A Systems Approach to Performance-Based Management: The National Drug Control Strategy.” Public Administration Review, 65(2), 191-202.
Yescombe, E. (2007) “Public-Private Partnerships: Principles of policy and finance.” Elsevier, London.
Yuan, J., Zeng, A. Y., Skibniewski, M. J., and Li, Q. (2009) “Selection of performance objectives and key performance Indicators in public-private partnerships projects to achieve value for money.” Constr. Manage. Econ., 27(3), 253-270.
Yuan, J., Wang, C., Skibniewski, M. J., e Li, Q. (2012) “Developing Key Performance Indicators for Public-Private Partnership Projects: Questionnaire Survey and Analysis.” J. Manage. Eng., 28(3), 252-264.
Downloads
Published
Issue
Section
License
Copyright (c) 2022 Bruno Lima, Carlos Oliveira Cruz

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.