Audit as a tool for project maturity certification in heavy civil construction
Keywords:
Regulation, Professionalism, Accountability, Auditor ReputationAbstract
Organizational learning stems from the synergy of human resources, using their qualification in the results of projects whose maturity may be assessed based on metrics that are still unavailable. These metrics are the first contribution of the present study. The analysis of two case studies of complex terminals, guided by the Front-End Load culture of gate approval for strategic advancement as a business organization, shows that audits are essentially able to measure the level of stakeholders in their consulting, inspection, management, and contractor roles, thereby assessing their productivity and, moreover, their ability to perform the contract without exceeding risks, costs, and deadlines. The analysis clearly shows that the audit should be used as a tool for project maturity certification in heavy civil construction based on this study.
References
Abbaszadegan, A. (2016). "Instantaneous project controls: Current status, state of the art, benefits, and strategies." Doctoral Thesis, Arizona State University, Tempe, AZ.
Andersen, E. S., and Jessen, S. A. (2003). "Project maturity in organisations." Int. J. Proj. Manag., 21(6), 457-461.
Anzanello, M. J., and Fogliatto, F. S. (2011). "Learning curve models and applications: Literature review and research directions." Int. J. Ind. Ergon., 41(5), 573-583.
Azuma, N. (2008). "The framework of INTOSAI Government Auditing Standards: in the stream of international convergence." Gov. Audit. Rev. Japão Tóquio, 15, 77-97.
Becerik, B. (2006). "Implementation and value of online collaboration and project management systems in design and construction." Doctoral Thesis, Harvard Graduate School of Design, Cambridge, MA.
Blegvad, K. (2007). "INTOSAI's new professional standards framework." Int. J. Gov. Audit., 34(4), 11.
Cherrington, J., and Towill, D. (1983). "Productivity control via learning curve models." Int. J. Prod. Res., 21(3), 337-346.
CMMI Product Team (2010). "Improving processes for developing better products and services, CMMI R G for Development." Version 1.3. Technical report, Carnegie Mellon University, Pittsburgh.
CONFEA (2015). "Conceitua o termo Projeto e define suas tipificações." DOU 23/04/15, Brasília, DF, 2.
de Moraes, F. R. G. (2010). "Constribuição ao estudo da concepção de projetos de capital em mega empreendimentos." Master's Thesis, Universidade Federal de Minas Gerais, Belo Horizonte, Brazil.
Eisenhardt, K. M. (1989). "Building theories from case study research." Acad. Manag. Rev., 14(4), 532-550.
Ferro, M. V., Bilbao, V. M. D., and Pena, F. J. R. (2016). "Modeling of learning curves with applications to pos tagging." Comput. Speech Lang., 41, 1-28.
Fioretti, G. (2007). "The organizational learning curve." Eur. J. Oper. Res., 177(3), 1375-1384.
Fogliato, F. S., and Anzanello, M. J. (2011). "Learning curve: The state of the art and research directions." Learning curves: Theory, models and applications, M. Y. Jaber, ed., CRC Press, Boca Raton, FL, 3-21.
Franceschini, F., Galetto, M., Maisano, D., and Mastrogiacomo, L. (2011). "A proposal of a new paradigm for national quality certification systems." Int. J. Qual. Reliab. Manag., 28(4), 364-382.
Graham, J. R., Li, S., and Qiu, J. (2008). "Corporate misreporting and bank loan contracting." J. Financial Econ., 89(1), 44-61.
Grosse, E. H., Glock, C. H., and Müller, S. (2015). "Production economics and the learning curve: A meta-analysis." Int. J. Prod. Econ., 170, 401-412.
Guangshe, J., Li, C., Jianguo, C., Shuisen, Z., and Jin, W. (2008). "Application of organizational project management maturity model (OPM3) to construction in China: An empirical study." Proc., 2008 Int. Conf. on Information Management, Innovation Management and Industrial Engineering, IEEE, Piscataway, NJ, 56-62.
Hobday, M. (2000). "The project-based organisation: an ideal form for managing complex products and systems?" Res. Policy, 29(7), 871-893.
Hoelscher, J. L. (2013). "Differential determinants and effects of audit quality." Thesis, University of Nebraska - Lincoln, Lincoln, NE.
Huber, G. P. (1991). "Organizational learning: The contributing processes and the literatures." Organ. Sci., 2(1), 88-115.
Jaber, M. Y., and Guiffrida, A. L. (2008). "Learning curves for imperfect production processes with reworks and process restoration interruptions." Eur. J. Oper. Res., 189(1), 93-104.
Jain, R., Singh, A. R., Yadav, H. C., and Mishra, P. K. (2014). "Using data mining synergies for evaluating criteria at pre-qualification stage of supplier selection." J. Intell. Manuf., 25(1), 165-175.
Jian, J.-Y. (2004). "An analysis and theoretical development of mental learning curves." Doctoral Thesis, Texas Tech University, Lubbock, TX.
Karpoff, J. M., Lee, D. S., and Martin, G. S. (2014). "The consequences to managers for financial misrepresentation." Accounting and regulation: New insigts on governance, markets and institutions, R. Di Pietra, S. McLeay, and J. Ronen, eds., Springer, New York, 339-375.
Khoshgoftar, M., and Osman, O. (2009). "Comparison of maturity models." Proc., 2nd IEEE Int. Conf. on Computer Science and Information Technology, IEEE, Piscataway, NJ, 297-301.
Leslie, S. E. (1997). "Forecasting the funding needs of infrastructure renewal: A construction estimating technique." Thesis, University of Cincinnati, Cincinnati.
Malerba, F. (1992). "Learning by firms and incremental technical change." Econ. J., 102(413), 845-859.
Merrow, E. W. (2011). Industrial megaprojects, Wiley, Hoboken, NJ.
Meyer, J. W., and Rowan, B. (1977). "Institutionalized organizations: Formal structure as myth and ceremony." Am. J. Sociol., 83(2), 340-363.
Mitra, S., Song, H., and Yang, J. S. (2015). "The effect of Auditing Standard No. 5 on audit report lags." Account. Horizons, 29(3), 507-527.
Molenaar, K. R. (2005). "Programmatic cost risk analysis for highway megaprojects." J. Constr. Eng. Manag., 10.1061/(ASCE)0733-9364(2005)131:3(343), 343-353.
Munsif, V., Raghunandan, K., and Rama, D. V. (2012). "Internal control reporting and audit report lags: Further evidence." Audit. J. Pract. Theory, 31(3), 203-218.
Plaza, M., Ngwenyama, O. K., and Rohlf, K. (2010). "A comparative analysis of learning curves: Implications for new technology implementation management." Eur. J. Oper. Res., 200(2), 518-528.
PMI (2008). "A guide to the project management body of knowledge." Project Management Institute, Newtown Square, PA, 507.
PMI (2009). "A guide to the project management body of knowledge." Project Management Institute, Newtown Square, PA, 507.
PMI (2013). Organizational project management maturity model (OPM3): Knowledge foundation, PMI, Newtown Square, PA.
Ramos, W. J. (2013). "Aplicação de VIPS em Projetos de Capital." Mundo Project Management, 51, 52-55.
Salem, O., Solomon, J., Genaidy, A., and Minkarah, I. (2006). "Lean construction: From theory to implementation." J. Manag. Eng., 10.1061/(ASCE)0742-597X(2006)22:4(168), 168-175.
Scholz, R. W., and Tietje, O. (2002). Embedded case study methods: Integrating quantitative and qualitative knowledge, Sage, Thousand Oaks, CA.
Suermann, P. C. (2009). "Evaluating the impact of building information modeling (BIM) on construction." Doctoral Thesis, University of Florida, Gainesville, FL.
Susan, P. (2016). "Third-party risk management: Moving up the maturity curve." RMA J., 98(8), 36-40.
Thomas, H. R., Mathews, C. T., and Ward, J. G. (1986). "Learning curve models of construction productivity." J. Constr. Eng. Manag., 10.1061/(ASCE)0733-9364(1986)112:2(245), 245-258.
Uysal, P. (2009). "Essays in macroeconomics." Doctoral Thesis, Boston College, Boston.
Vasarhelyi, M. A., Alles, M., Kuenkaikaew, S., and Littley, J. (2012). "The acceptance and adoption of continuous auditing by internal auditors: A micro analysis." Int. J. Account. Inf. Syst., 13(3), 267-281.
Williams, T. (2008). "How do organizations learn lessons from projects—And do they?" IEEE Trans. Eng. Manag., 55(2), 248-266.
Wolters Kluwer (2013). "TeamMate internal audit technology survey results now available." Manufacturing Close-Up. May 16.
Yin, R. K. (2013). Case study research: Design and methods, Sage, Thousand Oaks, CA.
Zorzal, F. M. B. (2013). Gerência ambiental: Resumo de experiências de gestão ambiental aplicadas à industria e a cidade pelas referências do PMBOK, PACO, São Paulo.
Zorzal, F. M. B. (2014). Gerência de Contratos: Propostas técnicas para licitações públicas e privadas, PACO, São Paulo.
Downloads
Published
Issue
Section
License
Copyright (c) 2022 Fábio Márcio Bisi Zorzal, Darli Rodrigues Vieira, Milena Chang Chain, Rebecca Pinheiro-Croisel